Concept of Capacity Index

The concept of Capacity Index ensures use of storage type hydro generating stations during peak hours and discourages spillage of water in case of run of the river hydro generating stations.

The notional variable charge for the hydro generating station is the average least variable cost of the thermal generating stations in the region. This facilitates full despatch of hydro generating stations in merit order.

Under the current tariff system, actual operation of the plant is necessary to recover a capacity charge, whereas under the previous tariff, availability of capacity was used to determine the capacity charge. This meant that, under the previous system, the capacity charge recovered by a power generating station was tied to the amount of capacity available rather than based on the
actual operation of the plant. As such, even if there was insufficient water to enable a power station to operate at maximum capacity, the power station could still recover a capacity charge commensurate with the amount of energy that it would have been able to generate through operation had there been a sufficient water supply.

With NAPAF being used to determine the capacity charge under the current system, availability of capacity will no longer have the same impact on capacity charge. Instead, actual production will affect the capacity charge.

The Commission has decided to implement the concept of Capacity Index in place of 'Availability'. The basic criteria for Capacity index are :
a) Water spillage must be minimized
b) As far as possible, the peak capAvailability of a hydro station for any period shall be based on the
Capacity Index (CI) declared for the day. It is defined as follows :
Declared Capacity (MW)
Capacity Index = ------------------------------------------------ x 100
Maximum Available Capacity (MW)acity of each plant must be available when most required by the system.

http://cercind.gov.in/2612/operational.pdf

Thursday, April 15, 2010

LNG Vs RIL - A good article

Poor infrastructure -- that bane of existence for most Indians and perpetually the weakest link in the country's chain of progress and development -- looks all set to also cut short its honeymoon with natural gas.

While the past year has been kind to the country's gas consumers, thanks to major new pipeline flows from Reliance's D6 block at agreeable rates and spot LNG prices falling back to the ground from their brief perch above $20/MMBtu in the winter of 2008/2009, disaster might be lurking just round the corner.

Why, you would ask, should the country be wanting for gas in today's global supply glut? The answer is simple: its pipeline network is maxed out.

Sure, some new transmission capacity will come up in 2011 with the addition of compressors and a parallel pipeline along the Hazira-Vijaipur-Jagdishpur arterial route serving the west and the north, but all of that is expected to be swallowed up by incremental flows from D6.

And sure, there is lots of new transmission capacity planned with billions of dollars in investment over the coming years. But nobody is holding his breath for it, what with the lack of clear policy on a national gas grid, in addition to regulatory opacity and financing hurdles.

D6 output, currently restricted to around 60 million cu m/day, is only waiting for next year's transmission capacity creep to leap to 90 or even 120 million cu m/day, according to sources. Yes, that's far higher than the 80 million cu m/day "peak" rate Reliance has been talking about.

There is talk of a game plan by the producer to flood and capture the market with its gas, even if that means a reduced plateau period and faster reservoir depletion. The government mandating fertilizer producers to move away from imported LNG to D6 gas helps, no doubt.

News reports mid-March of India courting its old friend Qatar and asking for up to 4 million mt/year of additional term supplies by 2013 over the current 7.5 million mt/year look very well on paper. The reality on the ground is there will be no pipeline capacity to evacuate that amount of gas.

Certainly not if Reliance gas continues to be available until 2014 for under $7/MMBtu at customer gate. Can term LNG, benchmarked to world crude prices, compete with freight, import taxes and regas costs stacked on?

No matter how much surplus Qatar has. Will it sell term cargoes at $5/MMBtu FOB to enable importers to compete with D6, notwithstanding the songs of friendship sung during oil minister Attiyah's March visit to India?

Probably not. So here's what we might see 5-6 years down the line: D6 is exhausted, there are no major new domestic gas sources on the horizon, the country's LNG importers have been all but snuffed out, and new import terminal projects have fallen by the wayside. Worse, world oil and gas markets have resumed their ascent to historic highs, while India is still struggling to accept market pricing for gas. Scary. And potentially disastrous.

The author is Asia News Director – Oil & Gas, Platts, a McGraw-Hill company. 

Vandana Hari article from Business standard

Monday, March 29, 2010

Punj Llyod exits Pipavav shipyard



"Interestingly, Punj is exiting at a price (Rs 50) lower than the IPO price of Rs 58. Yet it is also making a huge profit as it invested at Rs 27 a share, a merchant banker said. Punj shares closed at Rs 178.05 on the BSE, down by 3.86 per cent."

Saturday, March 27, 2010

Thursday, March 25, 2010

LNG

Natural gas is a colorless odorless liquid that burns cleaner and is used for heating, cooling and electricity apart from fertilizers and petrochemicals. The components of natural gas vary depending on the field, although regarded as a combustible fuel, NG in its natural occuring form is a complex hydrocarbon vapor which can be seperated by fractional distillation. The principal constituents on natural gas are as follows
C1 Methane, used for fueld and feedstock in power and fertilizer plants
C2 Ethane, Production of petrochemcials
C3 Proapne, Production of petrochemicals, LPG and industrial fuel
C4 Butane, Production of LPG
C5 Pentane and higher, prodcution of solvents

In India, the C3 and C4 fractions of natural gas are usually extracted in a Liquefied Petroleum Gas (LPG) extraction plant for making LPG. Typically, a 1:1 Propane-Butane mix is used for making LPG in India. After the extraction of the Propane and Butane streams (the process is called shrinkage of gas), the stream of gas (known as lean gas) is returned to the pipeline system.
However, at this point the calorific value of the gas is lower and could be as low as 8300 Kcal/ scm. The lean gas is rich in methane and accordingly used by fertilizer plants for producing ammonia from methane. While all fractions of the rich gas can be used by fertilizer and power plants, the value added to the C2, C3, C4, C5 and heavier fractions is greater when they are used for the production of LPG or when C2 and C3 is used for the production of petrochemicals

Natural gas may also contain moisture, hydrogen sulfide, carbon dioxide, nitrogen, helium, or other components that may be diluents and/ or contaminants. In any case, natural gas as produced is rarely suitable for pipeline transportation or commercial use. Natural gas in commercial distribution systems is composed almost entirely of methane and ethane, with moisture and other contaminants removed to very low concentrations. Although, internationally, there are no industry specifications for pipeline quality gas, each pipeline quality gas may impose other specifications parameters, depending on its system requirements.


Petronet LNG has tied up with quatar gas, for supply of additional 2.5mt of LNG at its Dahej terminal. I just wanted to understand what it means in terms of volumes of gas being transported. The conversion goes as follows
1 tonne of LNG = 2.17 metric cube of gas
2.5 million tonne of LNG =5425000 metric cube
Each carrier has a capaicty of 154800 per metric cube
which implies that to carry 2.5million tonnes the carrier has to take roughly 35 rounds.

The pricing of LNG is done as follows, japan is the major importer of LNG and hence the contracts are based on the pricing formula used by them for their contracts. The japnese LNG prices are based on the price of Japanese crude cocktail. Since India being a relatively undeveloped market, the contract that was negoitated was for a price of $2.53 based on the JCC price of $20/bbl, but from 1 Jan 2009, the price has been indexed to the actual JCC.

So the pricing works like this
JCC price : $20.bbl
FOB price of LNG: 2.53
Shipping charges:
Petronet LNG has contracted two ships of 138,000m3 for transport of LNG from quatar
Now 1tonne of LNG = 2.17m3 of LNG
Therefore 138,000m3 of LNG = 138000/2.17/10^6 mt of LNG = .063954 mmtpa
Now 1 mmtpa of LNG =50.9832tbtu (trillion btu)
so .063954mmtpa = .063954*50.9832*10^6 million btu
=3242377million btu
The charter rates for petronet LNG is $57900 per day and the route from quatar to india takes close to 15 days. Therfore the cost of 57900*12.5=$723750
hence the cost per mmtbu =723750/3242377 = 0.22/mmbtu
Port loading charges: .04/mmbtu
Transit insurance: zero
CIF price = 2.79/mmbtu
customs duty = 5.1% = 0.14/mmbtu
Regassifiacation charges: 0.57/mmbtu
Price ex-dahej :3.51
VAT@12.5% = 0.44/mmbtu
Markeing margin: .05/mmbtu
Pipeline tariff: 0.53/mmbtu
Service tax@10.3%=0.054/mmbtu

Regassification are the charges that are used by the company to cover for the debt service capabilities, fund O&m, income tax and provide returns to the equity investors with a provision to raise the charges by 5% every year. The company has port operation service contract with a singapore consortium. PLNG has signed offtake agreements with GAIL and IOC. GAIL has a diversified customer base with a large number of consumers spread across the glass, ceramics, chemicals, automotives, textiles, and steel industries, besides the power and fertilizer sectors—traditionally the largest consumers of natural gas in India. IOC has limited but high volume customers, with the company also consuming around 11% of its commitment under GSPC at its Koyali and Mathura refineries.The offtakers have been able to contract the gas with their customers only for a period of 10 years as opposed to their take or pay obligation of 25 years. Thus the offtaker faces the risk of non renewal of GSA beyond the contract period.

The joint payment service mechanism;

PLL and Ras gas have agreed upon a PSM, which envisages that the payments received from the offtakers would be divided into two accounts

· Fuel payment trust and retention account (FPTRA)

· Subaccount1: LNG charge account

· Subaccount2: Charter hire account

· PLL onshore trust and retention account (POTRA)

· Make statuary payments

· Meet o&M expenses

· Residual amount to be transferred to debt service account

· Residual cash would be available for appropriation.

With capacity utilisation of PLL’s plant being low in 2004-05, it could not absorb the high fixed costs of interest, depreciation and O&M, and posted a book loss. In 2005-06 however, as capacity utilisation improved, the company’s contribution, operating profit and net profit showed a significant improvement; this continues in the current fiscal. At its existing plant, PLL has a cushion to go up to an output of 6.3 MMTPA, considering its available regassification capacity (22.5 MMSCMD). To utilise its spare capacity, PLL has made its plant available on a tolling basis to offtakers for regassifying the LNG bought on the spot market. During the first quarter of 2006- 07, PLL handled one shipload of spot LNG, and subsequently, it has handled two more shiploads. The company earns regassification revenues of around Rs. 83.5 million for every shipload of spot LNG of volume 1,35,000 m3, which directly adds toThe company is in talks with Qatar, Oman, Egypt, Malaysia, Australia and Abu Dhabi in the United

Arab Emirates (UAE) for spot purchases its bottomline as the variable costs for tolling are negligible and the fixed costs are recovered through the existing regassification charges for 5mtpa

'The success in selling the entire stock of the first spot cargo bought by the company from Algeria has given us the confidence to go ahead with plans to purchase more spot cargoes of LNG,'company sources told IANS

Normally, countries inform one month in advance if any LNG cargo of three trillion British thermal unit (Btu), or equivalent of 80 million standard cubic metre (MMSCM) of natural gas, is likely to become available. On the basis of competitive bids, the spot cargo is sold.

West Coast: Qatar, Oman, Iran, Yemen
East Coast: Malaysia, Indonesia, Australia
Middle East is the preferred supply centre on the West Coast due to:
  1. Large gas reserves
  2. Transportation advantage
  3. Existing markets
  4. Pipeline and marketing infrastructure
  5. Expansion potential
Producer prices payable to ONGC/Oil India Ltd (OIL) are fixed by the government, based on the principle of 15 per cent post tax return on capital employed.

Nice article on affordability of gas pricing

http://groups.google.com/group/oil-and-gas-india/web/different-gas-prices-in-sync-with-the-affordability-of-various-gas-consuming-industries-a-practical-approach-to-gas-pricing-in-india